Lifted Logic Web Design in Kansas City clock location phone play pause chevron-down chevron-left chevron-right chevron-up chevron-down-medium facebook checkbox checkbox-checked radio radio-selected instagram google plus pinterest twitter youtube send linkedin outages phone-circle play-circle right-arrow left-arrow arrow-circle link checked unchecked new-window

Don’t Wait on the Utility – Power Your Data Center Now

September 5, 2025

Waiting for utility equipment can delay critical data center projects, but we have a solution.

 

Our Temporary Power Team recently deployed a 20 MVA mobile substation (138 kV to 13,200Y/7,620) with breakers, panels, cabling, and feeder breakers to keep a facility fully operational for testing and commissioning while the permanent utility feed was delayed.

 

Why it matters:

  • Turnkey solution: fully commissioned, safe, and compliant with high-voltage standards.
  • Innovative installation: custom skid to securely mount the 3000 AMP GOAB on asphalt.
  • Seamless integration with the utility and existing infrastructure.
  • Cross-division collaboration ensured rapid, reliable deployment.

 

The Result:

No costly delays, no temporary generators, and a data center ready to test, commission, and go live – before the permanent utility equipment arrives.

 

With Sunbelt Solomon, your project stays on schedule, your systems stay powered, and your operations stay ahead.