Waiting for utility equipment can delay critical data center projects, but we have a solution.
Our Temporary Power Team recently deployed a 20 MVA mobile substation (138 kV to 13,200Y/7,620) with breakers, panels, cabling, and feeder breakers to keep a facility fully operational for testing and commissioning while the permanent utility feed was delayed.
Why it matters:
- Turnkey solution: fully commissioned, safe, and compliant with high-voltage standards.
- Innovative installation: custom skid to securely mount the 3000 AMP GOAB on asphalt.
- Seamless integration with the utility and existing infrastructure.
- Cross-division collaboration ensured rapid, reliable deployment.
The Result:
No costly delays, no temporary generators, and a data center ready to test, commission, and go live – before the permanent utility equipment arrives.
With Sunbelt Solomon, your project stays on schedule, your systems stay powered, and your operations stay ahead.