Don’t Wait on the Utility – Power Your Data Center Now

Waiting for utility equipment can delay critical data center projects, but we have a solution.

Our Temporary Power Team recently deployed a 20 MVA mobile substation (138 kV to 13,200Y/7,620) with breakers, panels, cabling, and feeder breakers to keep a facility fully operational for testing and commissioning while the permanent utility feed was delayed.

Why it matters:

  • Turnkey solution: fully commissioned, safe, and compliant with high-voltage standards.
  • Innovative installation: custom skid to securely mount the 3000 AMP GOAB on asphalt.
  • Seamless integration with the utility and existing infrastructure.
  • Cross-division collaboration ensured rapid, reliable deployment.

The Result:

No costly delays, no temporary generators, and a data center ready to test, commission, and go live – before the permanent utility equipment arrives.

With Sunbelt Solomon, your project stays on schedule, your systems stay powered, and your operations stay ahead.

Explore Our Temporary Power Solutions

Related Articles

Crowd at the music festival

Trinity Provides Temporary Power for Massive Music Festival

The first temporary power rental that utilized equipment from our NEW branch in Ontario.
Gas meter

Trinity Goes the Distance To Power A Gas Plant Project

A Large Oil & Gas Co. required a temporary power solution for commissioning the backup system of their nearly-completed phase III gas plant.
Video camera

A Generator-Free Film Set

From emergency backup systems to festival stages, temporary power is often synonymous with generators, but not all of the time.